Primark -Lisburn

Location Icon
Lisburn &
Primark - Lisburn

Project Brief

John J Doyle were asked to design and carry out the necessary  calculations for the installation of a flue system for 2 x Elco Ecocond 190 condensing boilers. All Flues and associated works were completed on time for the boilers to be commissioned.

  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
  • Primark -Lisburn Gallery Image
Materials Used
  • Dinak DWJ Twin Wall 250Ø & Dinak DWJ Twin Wall 300Ø
Result

To supply labour and materials for the removal of existing and installation of 2 No. complete flue systems serving 2 No. Elco | Ecocond 190 condensing boilers. 250mm diameter Dinak DW stainless steel flue was installed from the boiler spigots to outside the boiler house – this was due to the limited space.

Once outside both flue systems increased to 300Ø Dinak DW stainless steel flue. Both flues rose individually clipped to the existing steel mast. They rose for approx. 15m to terminate with open terminals with mesh.

Flue calculations and design done inhouse.