Pharmaceutical Generator Project

Location Icon
Northern Ireland &
Pharmaceutical Plant

Industry

Pharmaceutical


Project Manager

Kyle Moore


Sector

Electrical


Duration

3 Days


Project Brief
 

John J Doyle ltd were asked to design, supply and install a new complete flue system & free standing support structure to serve a new 800kVA Diesel Generator at a pharmaceutical site in Northern Ireland. After calculations were carried out it was decided that a termination height of 10M would be suffice giving the surrounding conditions and location.

 

 

 

  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
  • Pharmaceutical Generator Project Gallery Image
Materials Used
  • Dinak GE50+ 316L/304L stainless steel – 300mm ID / 400mm OD.
  • S235JR Steel for support structure.
Result

Once flue sizing calculations and structural drawings were agreed, the bolt cage was issued by John J Doyle for builder to cast into foundations prior to structure arriving.

The flue for the vertical rise was installed on the free-standing structure within the factory during the manufacturing stage to minimise the amount of working at heights onsite. Once delivered, the structure and flue were craned into position and bolted to the new base.

A Unistrut frame was installed as a secondary support for the horizontal flue connections.

Installation was complete over 3 days.