Project Brief

WJM contracted John J Doyle Ltd to complete the design, supply material and labour for the installation of flues to suit 4 x Nesta 840kw Floor Standing Boilers.

Grove Wellbeing Centre operates under the consumer facing ‘Better’ brand which currently has 258 public sports and leisure facilities around the United Kingdom. Founded in 1993 these facilities welcome 46 million visitors a year and hold more than 650,000 members.

  • Grove Wellbeing Centre Gallery Image
  • Grove Wellbeing Centre Gallery Image
  • Grove Wellbeing Centre Gallery Image
Materials Used

DINAK DWJ 250Ø

Result

John J Doyle Ltd was contracted by WJM to design, supply material and labour for the installation of flues to suit 4 x Nesta840kw floor standing boilers.

The Dinak DWJ stainless steel 250mm flue rises off the back of each boiler, offset and exit through the existing opening in the plantroom roof. Once above roof level the new flues rise clipped to the existing support structure to terminate above the flue screen with open terminals and with mesh complying with all regulations.

We were scheduled in to complete the flue installation in two phases. This was to ensure that the centre never went without heating throughout the works. All the works were completed on time for the boilers to be commissioned.

All of the flue calculations and design done were done inhouse. The stock materials used were provided from the John J Doyle Ltd warehouse.