Project Brief
John J Doyle Ltd was awarded a contract by FG Mechanical to complete the flue systems for the regeneration project at Everards Printworks in Bristol.
The project consists of a collection of 1 & 2 bedroom apartments sitting alongside leisure, office space and a hotel whose grand entrance is framed by the grade II listed Everards Printworks building. With beautifully planned landscaping, footpaths, cycle lanes and access to the very best of Bristol’s restaurant, commercial and Arts scene, Everards is making its mark once again.
Materials Used
Dinak DWJ Twin Wall 350Ø
Dinak DWJ Twin Wall 250Ø
Result
FG Mechanical awarded John J Doyle Ltd the contract to design, supply and install the flue systems for the Everards Printwork regeneration project. This project required flue systems to suit a new condensing boiler and water heaters.
AutoCAD drawings and calculations were carried out in-house to size the flue systems for each application and to ensure compliance with European standards and the Clean Air Act.
This project had a very tight schedule and virtually no storage space. In order to keep with the site schedule, the verticles were initially installed and then the fitting team returned to install the horizontals. To manage the limited storage space all deliveries had to be booked in and installed almost immediately.
All chimney and flue products were supplied and installed CE Marked and compliant with European and regional standards.